POOL DETAILS

LEVEL DECK HYDROTHERAPY POOL
8M LENGTH X 6M WIDTH X 1.2M DEPTH

FEATURES

LEVEL DECK POOL
AUTOMATIC SLATTED POOL COVER

DMX CONTROLLED COLOUR-CHANGING CEILING LIGHTING
UV WATER PURIFICATION SYSTEM
AIR-PAD
AIR SOCK – VENTILATION SYSTEM
GRAB-RAILS ON THE POOL PERIMETER
BESPOKE HANDRAILS

TOM FINNEY SCHOOL HYDROTHERAPY POOL

FOLLOWING THE CLOSURE OF THE CITY OF PRESTON SCHOOL IN RIBBLETON, A £5.7 MILLION INVESTMENT WAS MADE TO CONVERT IT IN TO A STATE-OF-THE-ART SEN SCHOOL FOR THE PUPILS OF SIR TOM FINNEY COMMUNITY SCHOOL.   THE NEW CENTRE BOASTS TEACHING CLASSROOMS, A SPORTS HALL, A FITNESS SUITE, AND A HYDROTHERAPY POOL WITH DISABLED ACCESS.

OUR TEAM INSTALLED A 8 METRE BY 6 METRE HYDROTHERAPY POOL WITH GRAB-RAILS AND LONG STEP ENTRY FOR EASY ACCESS.  WE ALSO ADDED AN AIR-PAD TO BRING THE POOL TO LIFE AND DMX CONTROLLED COLOUR-CHANGE LIGHTING FOR SENSORY THERAPY. AN ULTRA-VIOLET LIGHT SYSTEM IS USED FOR WATER PURIFICATION, AND AN AUTOMATIC SLATTED POOL COVER FOR HEAT RETENTION AND SAFETY.

STAND OUT FEATURES

DMX CONTROLLED LED LIGHTING

AIR-SOCK VENTILATION SYSTEM

AUTOMATIC SLATTED POOL COVER

AIR-PAD