Hydrotherapy & Accessible Pools

Sir Tom Finney Community School – Preston

Case Study · 2025

A Hydrotherapy Pool for Sir Tom Finney School, Preston

8mPool Length 12 MonthsBuild Duration 2015Completion Year
The Story

From Vision to Reality.

01 · The Brief

The Brief

Following the closure of the City of Preston School in Ribbleton, a £5.7 million investment converted it into a state-of-the-art SEN school for the pupils of Sir Tom Finney Community School. Alongside classrooms, a sports hall and a fitness suite, the brief called for a hydrotherapy pool with full disabled access.

02 · The Challenge

The Challenge

An institutional SEN hydrotherapy pool must deliver dignified, independent access for pupils with a wide range of physical and sensory needs, while meeting the safety and operational standards of a school facility. Sensory provision, ventilation and water purification all had to be specified to suit daily use by vulnerable pupils.

03 · Our Approach

Our Approach

We installed an 8m × 6m level-deck hydrotherapy pool with grab-rails around the perimeter and a long step entry for easy, confident access. An airpad brings the pool to life, DMX-controlled colour-change lighting provides sensory therapy, a UV system purifies the water, and an air-sock ventilation system serves the room.

04 · The Result

The Result

The finished hydrotherapy pool gives Sir Tom Finney's pupils a safe, accessible and sensory-rich space within their new £5.7m school. The DMX-controlled lighting supports sensory therapy, the automatic slatted cover provides heat retention and safety, and bespoke handrails and a long step entry ensure dignified access for every user.

The Specification

Key Specifications.

Client Special Educational Needs school (commercial / institutional commission)
Pool 8m × 6m × 1.2m level-deck hydrotherapy pool
Access Grab-rails on the pool perimeter, bespoke handrails, long step entry
Features Airpad, DMX-controlled colour-change ceiling lighting for sensory therapy
Cover Automatic slatted pool cover for heat retention and safety
Ventilation Air-sock ventilation system
Water Treatment UV water purification system